Star date: 08/22/2014
This tutorial will not be updated as often as the "Structural Integrity" thread was. However, I feel that it does indeed deserve a tutorial. There will be 3-4 updates with pics/week. The images themselves will be edited for the best possible viewing to manifest detail.
I will be pre-fabricating the pieces. This is the beginning. I'll be working on several area's at the same time. Not to mention the other 4 projects I have going.
Pre-fabrication begins with TP's fastened around an object by way of soft-tie. It's similar to 14 gauge electrical wire and can be drawn tight. Glue is then applied to the outside. In order to keep the glue hidden, the shape will be bent inside out when dry.
Dee
"Haste is Waste"
This tutorial will not be updated as often as the "Structural Integrity" thread was. However, I feel that it does indeed deserve a tutorial. There will be 3-4 updates with pics/week. The images themselves will be edited for the best possible viewing to manifest detail.
I will be pre-fabricating the pieces. This is the beginning. I'll be working on several area's at the same time. Not to mention the other 4 projects I have going.
Pre-fabrication begins with TP's fastened around an object by way of soft-tie. It's similar to 14 gauge electrical wire and can be drawn tight. Glue is then applied to the outside. In order to keep the glue hidden, the shape will be bent inside out when dry.
Dee
"Haste is Waste"
Last edited: