I tied a truck down like that one time! Boss had a load of miscellaneous bee keeping equipment he was hauling to another beekeeper, told me and the boys to load it, so it was all ready for him to deliver Saturday morning. It was a slow day...
We tied every row twice, side to side. Tied it front to back, all 4 rows. Then Xed it front and rear, and each side. Looked like a big spider web over the load!!
Said he just shook his head when he pulled up the next morning and saw it. (
Yeah, I got a phone call at 8 am on Saturday morning telling me we were "really funny", and that we were all asssholes!) Got to where he was going and the other guy looked at the truck, got a strange look on his face, and after a few choice words, asked him if he was worried it was going to fall off, or what?! He muttered something to the extent his help apparently was. Said it took them 10 minutes to untie it all and 20 minutes to roll all the damn ropes up!! We only had about 800 ft. of rope on a 1 ton truck w/8'x12' flatbed, when the load could have been adequately secured with about 100 ft. of rope. We didn't get asked to load and tie much down for him after that, for some odd reason!!



Good looking deck Brink. Joints around the post look great too. How do you keep the ropes tight exposed to the elements?