HEY... HOUSTONNNNNN!!! WE HAVE LIFT OFF! YEH, WE'RE GOING PLACES NOW!
And with that being said I am posting videos to You Tube so I can post them here. We welded the bunks in place, log dogs, and rail stops then removed the carriage out of the way and then moved the track to the ground. It is a temp location as I will probably put this thing on an axle with jacks to make it portable. But we've got a saw mill!!! Complete with the first slab!
.... and then we figured out why the lawn tractor motor was free.... The clutch was going bad. LOL. I've got bits and pieces of metal all over the top of the slab where little chunks of metal were being sheared off because the bearings are bad. I almost quit for the day. But again, being the determined, obstinate type, I fired it back up and idled it through the rest of the cut which is the second video. I was amazed at how well this thing ripped through the ash even with the engine at idle. WOW! The first cut was at anywhere from 1/2 to 3/4 to full and then back to 3/4 and 1/2 throttle. I am impressed.
Here are some more picts of the day. We're done for now until I can get a new clutch put on.
The log we cut into was an ash. I didn't measure the diameter. It's big enough for a first log. I'd say the first slab is around 10-12 inches across. Didn't measure it either. What I will say is that the Ash borers have done a real job boring holes all in this piece of timber.
@rocky1, I haven't forgotten my promise to you. Just haven't gotten there yet. But I will. Thank you and
@woodtickgreg for all your help in sorting through the engine problems and to everyone else for your comments, tips, and encouragement. This is as much a part of your work as it is mine and Mary's.
Without further ado, here are the pics of today. And I will post the You Tube videos when they get uploaded.