Mun ebony urn

About 25 hours and 2,000 segments and it's done! I'm not sure, but I think this is the 36th urn that I've made.
Just curious ---- when you're gluing up the blank, are you gluing small blocks into ring shapes and then stacking the rings?
 
  • Thread Starter Thread Starter
  • #9
Just curious ---- when you're gluing up the blank, are you gluing small blocks into ring shapes and then stacking the rings?
No,I've ever made my rings and stacked them... it just takes too long. I bit the bullet and bought a jig. I made a Seg pro sled to cut the segments, the the jig to glue them. Some of my work has up to 144 pieces in each layer.
 
No,I've ever made my rings and stacked them... it just takes too long. I bit the bullet and bought a jig. I made a Seg pro sled to cut the segments, the the jig to glue them. Some of my work has up to 144 pieces in each layer.
Where did you buy the jig? Not sure I've seen one before. Thanks! Chuck
 
  • Thread Starter Thread Starter
  • #12
Where did you buy the jig? Not sure I've seen one before. Thanks! Chuck

The jig was bought from Tom Lohman about 3 years ago, here's the website: https://segmentedturning.org/
I used to talk to him frequently when I first bought it, he was very helpful in getting me up and running with it.

To design various things I've turned I used the Seg-Easy program from: http://www.segeasy.com/index.html

I built my own Wedgie sled from some scrap Corian I had and bought a set of Wedgies from Seg-Easy.

Overall it cost a few dollars for the entire setup, and about a month or two of a learning curve, and I even used some high school
geometry in some of my calculations.....

Let me know if I can help further..
Larry
 
Back
Top