Age a few more years Doug--getting up gets easier...and more urgent!! (at about 2:00 am.)I'm with Earl on this one. You get all nice and snug and warm under the covers, but cool air on your face. It's the getting up part that is hard.
Age a few more years Doug--getting up gets easier...and more urgent!! (at about 2:00 am.)I'm with Earl on this one. You get all nice and snug and warm under the covers, but cool air on your face. It's the getting up part that is hard.
Generally, 3% and under loss is considered acceptable. Any higher and adjustments need to be made to the combine, speed of travel, reel speed, fan speed, etc.How good are the combines? I mean, do you know what the waste factor is - e.g. what percentage of beans is lost or missed by the combines? Just curious how effective they are.
That's actually surprisingly good in my opinion. To design a machine that can strip beans off stems and separate from leaves and other debris and lose 3% or less - pretty darn good.Generally, 3% and under loss is considered acceptable. Any higher and adjustments need to be made to the combine, speed of travel, reel speed, fan speed, etc.
As you might imagine, lots of variables, but once the beans make it past the head, efficiency is high.
Pods set low on plant, uneven or rocky ground, moisture content too low (pods shattering), weeds present, etc all affect getting the beans cut and into the combine.
That's why many combines cost in the $600,000 - $1,000,000 range or more depending on the model and brand.That's actually surprisingly good in my opinion. To design a machine that can strip beans off stems and separate from leaves and other debris and lose 3% or less - pretty darn good.

Yeah, nobody around here actually says "combining". It's "pickin" beans or "pickin" corn.It's funny--when talking out loud Combine, Combined and Combining are pronounced one way for farming and another for every other use. But in print--it always takes me a minute to register the difference. When i read "they started combining the beans" at first i wondered why they were putting them together!! (even with the photo!!)
500 mcm?Wee bit of wiring happening on my trip to the Greater Seattle area last week.... 8 of those feed the 1.5mw (2000hp) Electric motor in our new test lab. (the Scar on my hand is about 3/8" in dia.)
View attachment 262893
No clue.... All I know is there was like 16+ spools of it in the way. I know 8 were run from the VFD to the motor inside the building. I believe the rest were for outside, to the Grid. The Construction & Electrical guys were behind schedule, which mostly negated my trip out there.....500 mcm?
we scrapped about 8000 feet of that in 3 strand when we dismantled the world market center las vegas temporary tents, at the beginning of the pandemic
feb 10th to march 23rd 2020
Thank you henryMy heart reaches out to you Boeng. I cannot imagine the pain you must feel. You and your family will be in my prayers.
Henry