Hey Kenbo do you sell these models? If so how much they run. I showed my mom and she loved the last one you posted. Your work is amazing.
Not sure if I'm going to bother going into that kind of detail...

Thanks for the kind words. As a rule of thumb, I don't sell these models. They take somewhere in the neighbourhood of 120+ hours to complete and even at $10/hour, that's $1200.00. Who, in their right mind, would pay that much for my silly little models? I just keep them myself. I did give away my motorcycle model but that was for my father as a Christmas gift.
).




For those that don't know, Ken likes for me to point out the occasional imperfection in his builds, because I am such an expert on these kinds of things ().
Ken you got the growth rings slightly off of vertical on your headlights. Try to avoid that in the future my friend. Otherwise looking very good......
View attachment 41347
I'm also seeing a fairly nasty mess in that planer bed. I hope you aren't failing to cleanup your sawdust between each pass of wood!
![]()
And that was the mess that I made turning the headlights. It's kind of funny that you mention the orientation of the headlights. I noticed that they were slightly off kilter and tried to fix them, but the glue had already set too much and I couldn't rotate them. 

I started of the day with some silly lathe work, making the drive shafts. I made two of them and installed them between the transfer case and the differentials. I then worked on the exhaust, which was a pain in the butt, because I didn't have any of the dowel size that I needed, so I had to make some 3/16" dowel before I could make the exhaust. Then I worked on the seat for the interior.....which are a bit of a pain due to the angle of the back of the seats. I also ended up making the cushions for all the seats and installing them all in the Jeep. I also cut and installed the hood stops........and that, was the entire day.
