Battery hold-downs completed and installed, sole/hull joints glassed and faired, and final epoxy coat applied to sole, bulkheads, flotation compartments, bilge, and lower sides. The same areas primed and with a good base coat - gloss poly in the areas that will be covered (for easier cleaning and maintenance and better water protection), flat Parkers in the cockpit area.
Now, off for our road trip to ME, CT, MA, and NY. On return will get shelves completed and installed and foam cut for installation in flotation compartments, then can finally get to work installing the decking I've prepped. I'd originally planned to get my wiring run before putting on the deck, but since I moved the runs out closer to the hull sides I'll wait until after decking is installed, fileted, sealed, and painted. Still a lot to do, but seeing the light at the end of the tunnel.
I haven't yet located a good used trailer and motor - if they aren't located soon after our return I'll have to get moving in ordering new.