What did you do in your shop today?

I didn't get much time today so I took what time I had and repaired a broken gitz oil cap on my southbend metal lathe. Then drilled holes and mounted a vice to the metal shop work bench. Some progress on the shop is better than no progress as I am in the home stretch to getting the shops done.
 
Had a partial day in the shop, got the showroom put back together after a show this past weekend, Didn't get any actual making done today but did get an envelope in the mail with some stuff that should interest folks like @Woody or his other Texas friend.... here are just 3 of the 11 sheets.

2016-09-12 21.17.31.webp
 
Tried to do my best Colin impersonation... I don't know how in the hell he does it!

Little bit of everything, bad picture included...

Outside to Inside -

Flame Box Elder
Not sure what that next one is...
Curly Walnut
Jamaican Dogwood
Maple Burl - I think... at least the curl in it looks like Maple, as did the raw blank.

Hate this kit! Exposed tube on bottom end tends to twist easily if you happen to catch, makes for a pain in the ass to fix.


NCM_0767.webp
NCM_0768.webp
 
Tried to do my best Colin impersonation... I don't know how in the hell he does it!

Little bit of everything, bad picture included...

Outside to Inside -

Flame Box Elder
Not sure what that next one is...
Curly Walnut
Jamaican Dogwood
Maple Burl - I think... at least the curl in it looks like Maple, as did the raw blank.

Hate this kit! Exposed tube on bottom end tends to twist easily if you happen to catch, makes for a pain in the ass to fix.


View attachment 113547
View attachment 113548

Yeah, the exposed tube can be a bother, I like the kit but usually throw away the squishy part. You didn't do a bad job at all! That's a fair amount of work there!


Here's my productivity for the day, 8 razor/brush sets and 5 safety razors.

2016-09-14 12.47.18.webp 2016-09-14 15.40.40.webp
 
It was rocking along pretty good, my first set went a little slow, hadn't been on the lathe in a few days. Then I decided to clean my tool rest up; filed the pits out of it. Which that helped immensely; it's been awhile since I cleaned it up, and it needed it. Next couple sets I was cruising, I'd glued the tubes up on 7 sets, but I was squaring my ends up, turning, finishing, and assembling a set an hour. Stopped for supper, then I hit the Flame Box Elder and both of those gave me grief; that set is destined for the house.

Had the same problems on both... Spun the tube on both of them. Light colored and show dirt easy, pulled nastiness off the bushing into the finish on the bottom half on both of them. Had to sand them both back to bare wood and start over. By the time I was done with those two, I'd had enough, gave up, took pictures and came to the house. Should have had 3 sets turned in the time I spent on that one set. And, the next set up on the bench is Box Elder Burl!

:wacko: :sorry: :wacko: :sorry: :wacko: :sorry: :wacko: :sorry::givebeer:
 
It was rocking along pretty good, my first set went a little slow, hadn't been on the lathe in a few days. Then I decided to clean my tool rest up; filed the pits out of it. Which that helped immensely; it's been awhile since I cleaned it up, and it needed it. Next couple sets I was cruising, I'd glued the tubes up on 7 sets, but I was squaring my ends up, turning, finishing, and assembling a set an hour. Stopped for supper, then I hit the Flame Box Elder and both of those gave me grief; that set is destined for the house.

Had the same problems on both... Spun the tube on both of them. Light colored and show dirt easy, pulled nastiness off the bushing into the finish on the bottom half on both of them. Had to sand them both back to bare wood and start over. By the time I was done with those two, I'd had enough, gave up, took pictures and came to the house. Should have had 3 sets turned in the time I spent on that one set. And, the next set up on the bench is Box Elder Burl!

:wacko: :sorry: :wacko: :sorry: :wacko: :sorry: :wacko: :sorry::givebeer:

Been There, done that. The other day had some blanks that would chip no matter what tool i used our how sharp it was.
 
So today I got a few things done, Turned, finished and assembled two dozen Concave pens, got enough additional stamp blanks glued up to fill the mold when I cast tomorrow (Six stamp pen/box sets sold yesterday so a few holes in the racks), and then the restaurant across the street needed three boards to display/serve cheese or something on, quick whacked out 3 8x18 maple boards, sanded them and got a few coats of butcher block oil on them, tomorrow I'll buff them up a bit and deliver in time for the wedding reception at 3pm.

2016-09-16 16.32.10.webp 2016-09-16 16.32.16.webp 2016-09-16 16.32.33.webp
 
Today I realized my rack was getting low on Carpenter Pencils so I whacked out 15 of them today, got the mold filled and the resin poured. I forgot how much easier fresh resin flows. Of course the last 8 ounces in my old can had some teeny tiny little floaty junk so I ended up with a tweezers pulling out anything that didn't migrate to the bottom. Grrrr. I use less catalyst for a longer working time so it was doable, just a pain in the butt.

2016-09-17 16.04.39.webp 2016-09-17 16.05.03.webp
 
1:
http://i1161.Rule #2/albums/q509/neil33ny/shoe%20locker%202%20434x512_zpssg18klul.jpg

1a:
http://i1161.Rule #2/albums/q509/neil33ny/shoe%20locker%204%20480x640_zpszraayaku.jpg

2:
http://i1161.Rule #2/albums/q509/neil33ny/cabinet%20components%202%20480x640_zps8tble4de.jpg

3:
http://i1161.Rule #2/albums/q509/neil33ny/shop%20mess%202%20480x640_zps1pzsmcmd.jpg

1. Finished up a Shoe Locker for a friend. Hand forged hinges by me.. Yes they are suppose to go on the inside of the lid, but I wanted to show them off. Now to finish and stain.
2. Got some kitchen base cabinet parts roughed out.
3. Made a big Freakin' Mess....

Why can't you do 1 and 2 w/o 3???

4. Sat down had one or three barley pops. A good day in the shop.....Priceless.

Happy Happy
 
Cut apart the slab I cast, turned, assembled and got the boxes made for some more pens.

IMAG3747.webp
 
:headscratch2:You got all that done, and worked on the Trailblazer transmission lines for 12 hours? Good grief dude!! You got any pictures of you wearing your superman cape?
 
:headscratch2:You got all that done, and worked on the Trailblazer transmission lines for 12 hours? Good grief dude!! You got any pictures of you wearing your superman cape?

The trailblazer job was over two days. About 4 1/2 hours of actual working on the truck each day. Delivered it to the neighbor. Showered and now eating dinner. So not quite 12, only 9
 
Back
Top