The issue is that they're tongue and groove. And very heavy. So trying to hold them in the right place and get everything lined up so they'd slide together was a bit difficult.
At least for me :)
Aha...that's why the seams don't line up to the studs.
If you have more to do, screw two or three blocks, horizontally over the groove side over hanging the edge by about 2 or 3 inches. (Into the stud at an angle, but not so tight that it's hard to slide the next panel into place, and away from the groove enough to not be in the way of the tongue part.) that helps line the tongue part up into the groove. slide into place. shims and either a crowbar or a drywall lifter helps to raise up the panel and is easy to use with your foot.
Last edited:


