Started to reorganize in the shed this evening. First step was to restack some lumber. The cherry is dry now, so it needed to go from sticker stacked to dead stacked. On the lumber rack, a dozen boards got moved from the middle section to the lower section. Then 2/3 of the middle section was previously on the top. Then 300BF of cherry got moved from a stack next to the rack to the top section. What's left on stickers is 100BF of ash that there is no room on the rack for. But I'll be making that into a workbench later this summer. When I know I will have two days of cooler weather, no rain, and plenty of free time I'll need to move the ash out of the shed, reorganize the shed, move some stuff from the garage into the shed, and then eventually get the ash into the garage - stacked who knows where in the garage because it's not like I have any room in there either!
View attachment 167538