That's a sweet hunk O Butternut. Can't wait to see it in the works.Started the next lighthouse. Don't have it totally planned out yet but I'm giving myself until the end of next April for completion. This is butternut for the column, which will be 26.5 inches. I could have done a glue up I suppose but I've had this butternut looking at me since November 2019. Need to finish a platter and will then start spinning the column.
View attachment 226787
Looks like they are easy to make! Please continue pics through to completion. ChuckGetting a jump start on charcuterie boards for the fall/winter craft season.
View attachment 226868
I got the 4/4 walnut slab for free. And folks buy these for $100+. Not a bad ROI, since they are not as time intensive as an end grain cutting board.
View attachment 226870
Any easy free form shaping to take best advantage of the board so much gets wasted. And even that goes to the wood stove next heating season.
View attachment 226869
Once I get the shop up I have a similar board to do the same with. And my idea was to do handles like yours to limit waste.Getting a jump start on charcuterie boards for the fall/winter craft season.
View attachment 226868
I got the 4/4 walnut slab for free. And folks buy these for $100+. Not a bad ROI, since they are not as time intensive as an end grain cutting board.
View attachment 226870
Any easy free form shape to take best advantage of the board so, not much waste. And even that goes to the wood stove next heating season.
View attachment 226869
Matter of time, you'll be sitting on that deck with your feet up, enjoying a cold beer and the view.Getting real close to done now. Maybe one more day to finish up little details such as the window sill, one electrical outlet we moved, the gutters, and the speakers. Be nice the dust and noise will be almost gone.
View attachment 227090
View attachment 227091
Congrats. Now to figure out how to celebrate with a margarita!!!!Couple shots of the finished roof over our deck. Came out really nice. The gutters are darker than they should be but we'll fix that next time we paint. I wanted gutters up before some rain storms last week. Ended up costing more than we estimated - combination of material prices, some design modifications required by the county, and a little inefficiency (my contractor liked to work by himself which means he wasted time going up and down ladders and off the deck/back onto the deck, etc.). But if he'd had a helper or small crew I'd have paid multiple workers so not sure which would have been better. But it's done, looks like what we envisioned, and ready for summer margaritas.
View attachment 227890
View attachment 227891
The bunny was just glad all the noise, sawdust and commotion was over ....
View attachment 227892
Expand on what the county required modifications were...Couple shots of the finished roof over our deck. Came out really nice. The gutters are darker than they should be but we'll fix that next time we paint. I wanted gutters up before some rain storms last week. Ended up costing more than we estimated - combination of material prices, some design modifications required by the county, and a little inefficiency (my contractor liked to work by himself which means he wasted time going up and down ladders and off the deck/back onto the deck, etc.). But if he'd had a helper or small crew I'd have paid multiple workers so not sure which would have been better. But it's done, looks like what we envisioned, and ready for summer margaritas.
View attachment 227890
View attachment 227891
The bunny was just glad all the noise, sawdust and commotion was over ....
View attachment 227892