Work bench build - picture heavy.

Working on the last mortice on this side.
Chiseled out 3/4 of the way through.
20261106_151044.webp
One leg done on one side.
20261107_144313.webp
Flipped them over and now I'll finish chiseling out this side.
20261107_144521.webp
 
You’re gonna owe your buddies a bunch of beer when they come help you move that beast. I can’t wait to see the final product!
 
You’re gonna owe your buddies a bunch of beer when they come help you move that beast. I can’t wait to see the final product!
I'm never moving, lol. It will be assembled in pieces and I'll make a video of the process so when I die and somebody has to get it out of my basement shop they'll know how to take it apart.:cool:
 
I'm never moving, lol. It will be assembled in pieces and I'll make a video of the process so when I die and somebody has to get it out of my basement shop they'll know how to take it apart.:cool:
The person that tries to take my bench apart will need the patience of Jobe and a chainsaw. I applaud you for having the foresight to make it that way. I never planned to be able to take it apart and built it that way. The top is 4” and that’s a through dovetail on one side with a mortise on the other side of the leg which is a saddle joint. A little glue and pins and there will never be any racking. Of course I’ve never been accused of over doing things.

View recent photos.webp
 
Last edited:
What are you doing for the top and vices? I have one vice screw that I didn’t use if you are interested. I’ll see if i can find it and post a picture.
 
What are you doing for the top and vices? I have one vice screw that I didn’t use if you are interested. I’ll see if i can find it and post a picture.
I'll only be installing one vice, its all I've ever needed. The bech top will have dog holes for stops. Thanks for the offer though, very kind of you.
 
Depends on how you build the vise but one screw can actually be 2 vises. The ole girl is aging gracefully and no longer looks that way.

IMG_3044.webp
 
Depends on how you build the vise but one screw can actually be 2 vises. The ole girl is aging gracefully and no longer looks that way.

View attachment 295102
I'll be using this record vise that I restored. It's almost as wide as one section of the bench top. I'll put dog holes in the movable vice jaw and 2 rows of dog holes down one section of the top. I've never needed anymore than that. If need be I can also clamp things to the top.
20200418_174233.webp
 
I'll be using this record vise that I restored. It's almost as wide as one section of the bench top. I'll put dog holes in the movable vice jaw and 2 rows of dog holes down one section of the top. I've never needed anymore than that. If need be I can also clamp things to the top.
View attachment 295106
I think I have the same vise.
 
Mine is a 8" quick release, it's worked perfectly for well over 20 years. I've got a ten inch columbian on the other end of the bench, also a good vise
 
Started working on the other side a bit today, got 2 holes done. Test block passes through.
20261109_143707.webp 20261109_143714.webp
 
First cross stretchers is fitted to the leg.
20261113_145007.webp 20261113_145021.webp
And now all the cross stretchers are fitted to give the base its shape. Next I'll chop out mortices for the wedges that will lock it all together. And I'll make the wedges out of some walnut.
20261113_170346.webp
Here you can see that I designed this so that it sits right on the ground so nothing can roll under the bench and it wont be necessary to clean under it. There will be a shelf on the bottom for the shop air cleaner to sit on. You can see it under the old wobly bench.
20261113_170404.webp
Even with the clamps off and no wedges the legs dont rack. The base alone is probably close to 200 lbs. This is what i wanted, mass! It wont move.
20261113_170904.webp
 
First cross stretchers is fitted to the leg.
View attachment 295246View attachment 295247
And now all the cross stretchers are fitted to give the base its shape. Next I'll chop out mortices for the wedges that will lock it all together. And I'll make the wedges out of some walnut.
View attachment 295248
Here you can see that I designed this so that it sits right on the ground so nothing can roll under the bench and it wont be necessary to clean under it. There will be a shelf on the bottom for the shop air cleaner to sit on. You can see it under the old wobly bench.
View attachment 295249
Even with the clamps off and no wedges the legs dont rack. The base alone is probably close to 200 lbs. This is what i wanted, mass! It wont move.
View attachment 295250
Gonna be perfect!
 
First cross stretchers is fitted to the leg.
View attachment 295246View attachment 295247
And now all the cross stretchers are fitted to give the base its shape. Next I'll chop out mortices for the wedges that will lock it all together. And I'll make the wedges out of some walnut.
View attachment 295248
Here you can see that I designed this so that it sits right on the ground so nothing can roll under the bench and it wont be necessary to clean under it. There will be a shelf on the bottom for the shop air cleaner to sit on. You can see it under the old wobly bench.
View attachment 295249
Even with the clamps off and no wedges the legs dont rack. The base alone is probably close to 200 lbs. This is what i wanted, mass! It wont move.
View attachment 295250
Looking great. By the way, I love the look of calico ash. Don't see much in our area.
 
I had to get creative with the set up on the morticer. I had to shim it to minimize blowout on the back side. I used a roller stand to support the heavy beam.
20261123_160108.webp
1" square hole for the wedge. I'll chisel out the last bit on one side to 5 degrees for the wedge.
20261123_160134.webp
8 wedge holes layed out and bored today
20261123_171217.webp
 
Looking good. I like to chisel out the backside first and then coming in from the front with the mortiser to minimize the blowout.

On thru tenons I cut 2 slots in the tenon and use 2 wedges. Incredibly strong and the joint gets very tight.
 
Looking good. I like to chisel out the backside first and then coming in from the front with the mortiser to minimize the blowout.

On thru tenons I cut 2 slots in the tenon and use 2 wedges. Incredibly strong and the joint gets very tight.
Parallel or orthogonal slots? I have seen axes with either.
 
Parallel. I used draw pins to pull the joint together so no clamps needed. Then wedges to make the joint incredibly tight. These joints will never rack.

One reason I really like using wedges is the there is a good mechanical connection for the glue like you get when clamps are used on boards when glueing except the wedge is pushing the wood together instead of pulling it.

The tenon wedge slot needs to be cut longer than the wedge so when the wedge is hammered in, it splays the tenon and allows to tenon to bend and not start a crack. Also orient the wedge perpendicular to the grain on the board with the mortise so the board won’t split.

IMG_3468.webp
 
Last edited:
However, I just realized the bench being built will have wedges to pull the tenons tight and when knocked out, the bench can be broken down. My joint shown is designed to never come apart. His work is an outstanding joinery example of a joint that can be disassembled.
 
Back
Top